RIM100 User's Manual
User-Supplied Components
Power Switch
RIM100 Screw Terminals
Fuse
Fuse
Monitored
AC Load
To AC Breaker
Panel
1 2 5 4 3 6 7 8 9 10 11 12
V1+
V2-
V1-
V2+
V3+
V3-
V4+
V4-
V5+
V5-
V6+
V6-
Figure 4 – AC Single-Phase (Ph. A,B) or AC Three-Phase Load Connection Diagram
2.4.2.2 DC Load
Please refer to Figure 5 for connecting the RIM100 to a DC load. Please note in this case that
you must connect the positive voltage from the monitored load to the terminal marked “+” and
the negative voltage from the monitored load to the terminal marked “-”. This figure shows the
connection of the monitored load to channel 1 via the terminals named V1+ and V1-.
Connections to other channels are similar.
Power Switch
RIM100 Screw Terminals
Monitored
DC Load
+ To DC
- Breaker Panel
Fuse
User-Supplied Components
1 2 5 4 3
6 7 8 9 10 11 12
V1+
V2-
V2+
V1-
V3+
V3-
V4+
V4-
V5+
V5-
V6+
V6-
Figure 5 – DC Load Connection Diagram
Page 6 Revision 1.1